هذه الصفحة غير متوفرة باللغة العربية بعد — نعرضها بالإنجليزية.

Lotus Temple Coloring Pages

  • للأعمار 3–12
  • عدد الصفحات: 30
  • الإنجليزية
  • A4 + US Letter
  • حُدّث في 19 أكتوبر 2026

These lotus temple colouring pages show the famous New Delhi landmark in simple and detailed designs for children aged 3 to 12. They are free to download and print for quiet time at home or use in your classroom.

Pick a Lotus Temple page

Colouring page: Show the Lotus Temple alone, centered and front-facing, with its large curved petals, entrance windows, a few surrounding pools, and a simple garden border. Leave the sky and ground…
مجانيللأعمار 2–4 · PDF · A4/Letter

Lotus Temple Outline

Show the Lotus Temple alone, centered and front-facing, with its large curved petals, entrance windows, a few surrounding pools, and a simple garden border. Leave the sky and ground….

Colouring page: Draw the Lotus Temple from the front with three broad pools in the foreground and a few rounded garden shrubs. Make the building the largest shape on the page.
مجانيللأعمار 2–4 · PDF · A4/Letter

Temple And Pools

Draw the Lotus Temple from the front with three broad pools in the foreground and a few rounded garden shrubs. Make the building the largest shape on the page.

Colouring page: Place the Lotus Temple behind a simple garden with two large trees, a winding path, and a few oversized flowers. Keep the building fully visible in the centre.
مجانيللأعمار 2–4 · PDF · A4/Letter

Lotus Temple Garden

Place the Lotus Temple behind a simple garden with two large trees, a winding path, and a few oversized flowers. Keep the building fully visible in the centre.

Colouring page: Show one child standing on a path and looking toward the Lotus Temple, with the temple, a pool, two clouds, and simple bushes behind. The child should be seen from behind so the monument…
مجانيللأعمار 2–4 · PDF · A4/Letter

Child Sees Temple

Show one child standing on a path and looking toward the Lotus Temple, with the temple, a pool, two clouds, and simple bushes behind. The child should be seen from behind so the monument….

Colouring page: Draw the Lotus Temple beneath three large rounded clouds, with calm reflecting pools and a low garden wall in front. Use a wide, uncluttered landscape composition.
مجانيللأعمار 2–4 · PDF · A4/Letter

Temple Under Clouds

Draw the Lotus Temple beneath three large rounded clouds, with calm reflecting pools and a low garden wall in front. Use a wide, uncluttered landscape composition.

Colouring page: Show the Lotus Temple with a rising sun, two simple palm trees, a path, and one small family walking toward the entrance. The temple should occupy the centre and upper half of the page.
مجانيللأعمار 2–4 · PDF · A4/Letter

Morning Temple Visit

Show the Lotus Temple with a rising sun, two simple palm trees, a path, and one small family walking toward the entrance. The temple should occupy the centre and upper half of the page.

Colouring page: Show a large Lotus Temple above one broad pool that reflects its main petal shapes, with a simple grassy bank and two rounded bushes. Keep the reflection recognizable but not detailed.
مجانيللأعمار 2–4 · PDF · A4/Letter

Temple Reflection

Show a large Lotus Temple above one broad pool that reflects its main petal shapes, with a simple grassy bank and two rounded bushes. Keep the reflection recognizable but not detailed.

Colouring page: Draw two children sitting quietly on a garden bench while the Lotus Temple and its pools appear behind them. Include a few large leaves and a simple pathway.
مجانيللأعمار 2–4 · PDF · A4/Letter

Friends At The Garden

Draw two children sitting quietly on a garden bench while the Lotus Temple and its pools appear behind them. Include a few large leaves and a simple pathway.

Colouring page: Show the Lotus Temple in a simple garden with one leafy tree, one flowering tree, a few falling leaves, and a small puddle suggesting changing seasons. Keep all seasonal details large…
مجانيللأعمار 2–4 · PDF · A4/Letter

Temple In The Seasons

Show the Lotus Temple in a simple garden with one leafy tree, one flowering tree, a few falling leaves, and a small puddle suggesting changing seasons. Keep all seasonal details large….

Colouring page: Draw a winding path leading through a garden toward the Lotus Temple, with one small child carrying a water bottle and looking at the pools. Add a few large clouds and bushes in the…
مجانيللأعمار 2–4 · PDF · A4/Letter

Quiet Temple Path

Draw a winding path leading through a garden toward the Lotus Temple, with one small child carrying a water bottle and looking at the pools. Add a few large clouds and bushes in the….

Colouring page: Show a three-quarter view of the Lotus Temple surrounded by several geometric pools, clipped lawns, and a low line of bushes. Include a few broad clouds in the sky.
مجانيللأعمار 5–7 · PDF · A4/Letter

Lotus Temple By Pools

Show a three-quarter view of the Lotus Temple surrounded by several geometric pools, clipped lawns, and a low line of bushes. Include a few broad clouds in the sky.

Colouring page: Draw a family of four walking quietly along a paved path toward the Lotus Temple, with pools, garden shrubs, and a few Delhi buildings far behind. Show the temple's layered petals…
مجانيللأعمار 5–7 · PDF · A4/Letter

Family At Lotus Temple

Draw a family of four walking quietly along a paved path toward the Lotus Temple, with pools, garden shrubs, and a few Delhi buildings far behind. Show the temple's layered petals….

Colouring page: Place the Lotus Temple behind a foreground garden of flowering plants, curved paths, and two benches. Include its entrance openings, layered petals, pools, and a few distant trees.
مجانيللأعمار 5–7 · PDF · A4/Letter

Temple From The Garden

Place the Lotus Temple behind a foreground garden of flowering plants, curved paths, and two benches. Include its entrance openings, layered petals, pools, and a few distant trees.

Colouring page: Show the Lotus Temple in the foreground with its pools and gardens, while a simple New Delhi skyline of low buildings and a distant tall tower appears behind it. Add soft clouds and a…
مجانيللأعمار 5–7 · PDF · A4/Letter

Delhi Skyline Temple

Show the Lotus Temple in the foreground with its pools and gardens, while a simple New Delhi skyline of low buildings and a distant tall tower appears behind it. Add soft clouds and a….

Colouring page: Draw the Lotus Temple during a gentle monsoon shower, with large raindrops, wet reflecting pools, umbrellas held by two visitors, and lush garden plants. Keep the building fully visible…
مجانيللأعمار 5–7 · PDF · A4/Letter

Temple In Rain

Draw the Lotus Temple during a gentle monsoon shower, with large raindrops, wet reflecting pools, umbrellas held by two visitors, and lush garden plants. Keep the building fully visible….

Colouring page: Show the Lotus Temple at sunset with a low sun, layered clouds, darkening garden trees, pools, and three visitors walking along the path. The petal edges and windows should remain…
مجانيللأعمار 5–7 · PDF · A4/Letter

Evening Lotus Temple

Show the Lotus Temple at sunset with a low sun, layered clouds, darkening garden trees, pools, and three visitors walking along the path. The petal edges and windows should remain….

Colouring page: Show two children seated on a mat in a permitted-looking garden area, quietly viewing the Lotus Temple across a lawn and pools. Add a basket, a few flowers, a tree, and distant Delhi…
مجانيللأعمار 5–7 · PDF · A4/Letter

Temple Garden Picnic

Show two children seated on a mat in a permitted-looking garden area, quietly viewing the Lotus Temple across a lawn and pools. Add a basket, a few flowers, a tree, and distant Delhi….

Colouring page: Draw a front view of the Lotus Temple at dawn with a pale sun, long clouds, calm pools, garden lamps without text, and one visitor standing quietly near the path. Emphasize the…
مجانيللأعمار 5–7 · PDF · A4/Letter

Lotus Temple At Dawn

Draw a front view of the Lotus Temple at dawn with a pale sun, long clouds, calm pools, garden lamps without text, and one visitor standing quietly near the path. Emphasize the….

Colouring page: Show the Lotus Temple surrounded by an Indian garden with marigold-like flower beds, neem-like trees, a stone path, pools, and a gardener watering plants. The building should remain the…
مجانيللأعمار 5–7 · PDF · A4/Letter

Temple And Indian Garden

Show the Lotus Temple surrounded by an Indian garden with marigold-like flower beds, neem-like trees, a stone path, pools, and a gardener watering plants. The building should remain the….

Colouring page: Draw a teacher and three children observing the Lotus Temple from a garden path, with one child pointing toward the petals and another looking at the pools. Include trees, clouds, and a…
مجانيللأعمار 5–7 · PDF · A4/Letter

School Visit Temple

Draw a teacher and three children observing the Lotus Temple from a garden path, with one child pointing toward the petals and another looking at the pools. Include trees, clouds, and a….

Colouring page: Show a detailed front three-quarter view of the Lotus Temple, including overlapping marble petals, entrance openings, surrounding pools, curved paths, clipped lawns, and layered garden…
مجانيللأعمار 8–12 · PDF · A4/Letter

Lotus Temple Details

Show a detailed front three-quarter view of the Lotus Temple, including overlapping marble petals, entrance openings, surrounding pools, curved paths, clipped lawns, and layered garden….

Colouring page: Draw the Lotus Temple from a gently elevated viewpoint, showing the flower-shaped roof, concentric garden paths, multiple reflecting pools, lawns, trees, and small visitors around the…
مجانيللأعمار 8–12 · PDF · A4/Letter

Temple From Above

Draw the Lotus Temple from a gently elevated viewpoint, showing the flower-shaped roof, concentric garden paths, multiple reflecting pools, lawns, trees, and small visitors around the….

Colouring page: Show a close, detailed view of the Lotus Temple and its reflection in a broad pool, with overlapping petals, window openings, water ripples, reeds, garden trees, and a few birds. Keep…
مجانيللأعمار 8–12 · PDF · A4/Letter

Lotus Temple Reflection Study

Show a close, detailed view of the Lotus Temple and its reflection in a broad pool, with overlapping petals, window openings, water ripples, reeds, garden trees, and a few birds. Keep….

Colouring page: Draw the Lotus Temple during the rainy season with layered clouds, falling rain, puddles, lush trees, flowering plants, umbrellas, and visitors moving along wet paths. Include the pools…
مجانيللأعمار 8–12 · PDF · A4/Letter

Temple In Monsoon Garden

Draw the Lotus Temple during the rainy season with layered clouds, falling rain, puddles, lush trees, flowering plants, umbrellas, and visitors moving along wet paths. Include the pools….

Colouring page: Show an evening garden around the Lotus Temple with rows of small unlit decorative lamps along paths, pools reflecting the petals, trees, clouds, and quietly walking visitors. Do not…
مجانيللأعمار 8–12 · PDF · A4/Letter

Festival Of Garden Lights

Show an evening garden around the Lotus Temple with rows of small unlit decorative lamps along paths, pools reflecting the petals, trees, clouds, and quietly walking visitors. Do not….

Colouring page: Place the Lotus Temple in the foreground with detailed pools, lawns, paths, trees, and visitors, while the New Delhi skyline stretches across the background. Include varied low…
مجانيللأعمار 8–12 · PDF · A4/Letter

Temple And City View

Place the Lotus Temple in the foreground with detailed pools, lawns, paths, trees, and visitors, while the New Delhi skyline stretches across the background. Include varied low….

Colouring page: Show a close view of the Lotus Temple's curved marble petals and entrance windows from below, with the pools, garden edges, trees, and a few visitors visible at the bottom. The…
مجانيللأعمار 8–12 · PDF · A4/Letter

Architectural Petals Study

Show a close view of the Lotus Temple's curved marble petals and entrance windows from below, with the pools, garden edges, trees, and a few visitors visible at the bottom. The….

Colouring page: Draw several visitors of different ages quietly walking, sitting, or looking toward the Lotus Temple, with a detailed path, benches, pools, flowering beds, trees, and the Delhi skyline…
مجانيللأعمار 8–12 · PDF · A4/Letter

Quiet Visitors Temple

Draw several visitors of different ages quietly walking, sitting, or looking toward the Lotus Temple, with a detailed path, benches, pools, flowering beds, trees, and the Delhi skyline….

Colouring page: Frame the Lotus Temple through foreground branches and leaves, revealing its layered petals, windows, pools, garden paths, and a child sketching the view on a blank sheet held on their…
مجانيللأعمار 8–12 · PDF · A4/Letter

Temple Through Trees

Frame the Lotus Temple through foreground branches and leaves, revealing its layered petals, windows, pools, garden paths, and a child sketching the view on a blank sheet held on their….

Colouring page: Show the Lotus Temple beneath a large moon and stars, with quiet pools reflecting the petals, garden trees, curved paths, lamps, and two visitors walking calmly. Keep the night scene…
مجانيللأعمار 8–12 · PDF · A4/Letter

Moonlit Lotus Temple

Show the Lotus Temple beneath a large moon and stars, with quiet pools reflecting the petals, garden trees, curved paths, lamps, and two visitors walking calmly. Keep the night scene….

At a glance

  • Ages: 3 to 12
  • Skills: Colouring, focus, observation
  • You need: Printer, paper, crayons or pencils
  • Time: 10 to 25 minutes

Pages for young children and older learners

This set presents the Lotus Temple with clear outlines, its petal-shaped roof, surrounding pools, gardens and the Delhi skyline. Young children can colour large shapes with crayons, while older children can work on smaller details, shading and a carefully chosen colour scheme. Some designs keep the building as the main subject. Others add people, trees, clouds or a simple India theme. The pages give children a gentle way to observe an important Indian monument while practising careful colouring at their own level.

Simple ideas for home and class

At home, let your child choose one page for a quiet afternoon activity, then ask them to point out the petals, windows and water. In class, use a page after a lesson about India, New Delhi or famous buildings. Children can colour in pairs, compare how they represented the pools and gardens, or label the parts of the building on the back. Display the finished work with a small map of India or a handwritten sentence such as, "The Lotus Temple is in New Delhi."

Three child-friendly facts about the Lotus Temple

The Lotus Temple is in New Delhi, India. It is a Bahá'í House of Worship, and its building has the form of a large white lotus flower. The temple welcomes people from all faiths, and visitors sit quietly inside because there are no formal rituals or sermons. The flower-like structure is made from curved marble petals, with pools around it that can reflect the building. Share one fact before colouring and invite your child to find that feature in the picture.

Lumi's tips

  • For a younger child, point to each large petal and name a colour before they begin colouring it.
  • For an older child, use two shades for the marble petals and add light reflections in the pools without covering the outlines.
  • After colouring, look at a photograph of the Lotus Temple together and talk about its shape, gardens and place in New Delhi.

How to download and print

  1. Sign in or join free, it takes a few seconds.
  2. Choose a page and tap Download. Pick A4 or US Letter to match your paper.
  3. Open the PDF and print at "Actual size" (100%) so nothing is cut off.
  4. Your downloads stay in My Library, so you can print them again any time.

أسئلة يطرحها الأهل

What are Lotus Temple colouring pages?

They are printable activity sheets showing the Lotus Temple, its petal-shaped building and related details such as gardens, pools or the Delhi setting. Children can colour them with crayons, pencils or felt pens.

Are these lotus temple colouring pages suitable for preschool children?

Yes. Choose designs with large, open shapes for children aged 3 to 5. Older children can use pages with more building details and background features.

What colours can children use for the Lotus Temple?

Children can use white, cream or pale grey for the marble, with green for gardens and blue for the pools. There is no single correct colour scheme, so children may add their own creative choices.

Can I download and print these Lotus Temple colouring pages?

Yes. The pages are free to download and print. Files are PDFs made for A4 and US Letter paper, and downloading needs a free EarlyActivity account.

What can children learn from a Lotus Temple colouring activity?

They can learn that the Lotus Temple is a well-known building in New Delhi and a Bahá'í House of Worship. The activity also gives them practice with observation, colour choice and careful hand control.

More india: culture & monuments

Diya Coloring Pages

المطبوعات: 28 · للأعمار 3–12

These diya colouring pages give children simple and detailed pictures of traditional Indian lamps to colour. They suit children aged 3 to 12 and are free to print for use at home or in your own classroom.

Elephant Festival Coloring Pages

قريبًا · للأعمار 3–12

These elephant festival colouring pages show decorated elephants, festive scenes and Indian patterns for children aged 3 to 12. They are free to print for a quiet activity at home or in your classroom.

India Gate Coloring Pages

المطبوعات: 30 · للأعمار 3–12

These india gate coloring pages give children aged 3 to 12 simple and detailed pictures of the famous New Delhi monument to colour. They are free to print for quiet time at home, school activities or an India-themed project.

Indian Dance Coloring Pages

قريبًا · للأعمار 3–12

These indian dance colouring pages show dancers, costumes, hand gestures, musical instruments and performance scenes for children aged 3 to 12. They are free to print and suit quiet time at home, art lessons or India-themed classroom work.

Indian Flag Coloring Pages

المطبوعات: 28 · للأعمار 3–12

These Indian flag coloring pages give children aged 3 to 12 simple and detailed designs to colour while learning about India's national flag. They are free to download and print for use at home or in your own classroom.

Indian Monuments Coloring Pages

المطبوعات: 25 · للأعمار 3–12

These Indian monuments colouring pages give children aged 3 to 12 simple and detailed pictures of famous buildings and historic places to colour. They are free to print for use at home or in your own classroom.

انتهت تنزيلاتك المجانية لليوم (20)!

تحتاج المزيد اليوم؟
مع Plus تحصل على 200 تنزيل يوميًا (استخدام عادل)، بلا إعلانات، تنزيل الكل وحزمة مجانية كل شهر. الشهر الأول ₹99.
تعرّف على Plus ←

صفحة إضافية لأعضاء Plus

تعرّف على Plus

Your cart (0)

Your cart is empty.