Worksheet: Draw a cat sitting beneath a broad leafy tree, looking up at one falling leaf. Include the tree trunk, a few large leaves, a patch of grass, and the cat's curved tail.
FREE

Cat Under A Tree

Draw a cat sitting beneath a broad leafy tree, looking up at one falling leaf. Include the tree trunk, a few large leaves, a patch of grass, and the cat's curved tail.

  • Ages 4–12
  • PDF
  • A4 + US Letter
  • English

Part of How to Draw a Cat

More from this collection

Worksheet: Draw a front-facing cat face using one large round head, two big triangular ears, two wide eyes, a tiny nose, and a smiling mouth. Leave plenty of open space around the face for colouring.
FREEAges 4–12 · PDF · A4/Letter

Big Cat Face

Draw a front-facing cat face using one large round head, two big triangular ears, two wide eyes, a tiny nose, and a smiling mouth. Leave plenty of open space around the face for colouring.

Worksheet: Show a standing cat built from a large oval body, a round head, four simple oval paws, triangular ears, and a long curved tail. Place the cat alone in the centre of the page.
FREEAges 4–12 · PDF · A4/Letter

Circle And Oval Cat

Show a standing cat built from a large oval body, a round head, four simple oval paws, triangular ears, and a long curved tail. Place the cat alone in the centre of the page.

Worksheet: Draw a sitting cat facing forward with a round head, pointed ears, a wide body, two front paws, and a tail curling beside one leg. Add only two eyes, a nose, and a few whiskers.
FREEAges 4–12 · PDF · A4/Letter

Sitting Cat Outline

Draw a sitting cat facing forward with a round head, pointed ears, a wide body, two front paws, and a tail curling beside one leg. Add only two eyes, a nose, and a few whiskers.

Worksheet: Draw a simple standing cat with a large head, upright ears, four short legs, and a tail making one big friendly curve behind its body. Add a small patch on the chest.
FREEAges 4–12 · PDF · A4/Letter

Cat With Curved Tail

Draw a simple standing cat with a large head, upright ears, four short legs, and a tail making one big friendly curve behind its body. Add a small patch on the chest.

Worksheet: Draw a curled-up sleeping cat as one large rounded body shape with a tucked head, closed eyes, two ears, and a tail wrapped across the paws. Add a simple oval mat underneath.
FREEAges 4–12 · PDF · A4/Letter

Sleepy Cat Shape

Draw a curled-up sleeping cat as one large rounded body shape with a tucked head, closed eyes, two ears, and a tail wrapped across the paws. Add a simple oval mat underneath.

Worksheet: Draw a simple sitting cat beside a shallow food bowl. Include a large head, pointed ears, front paws together, a curved tail, and a few small floor marks around the bowl.
FREEAges 4–12 · PDF · A4/Letter

Cat By A Bowl

Draw a simple sitting cat beside a shallow food bowl. Include a large head, pointed ears, front paws together, a curved tail, and a few small floor marks around the bowl.

Worksheet: Draw a cat stretching forward with front paws extended, a raised rounded back, hind legs behind, upright ears, and a curved tail. Place the cat on a simple floor line.
FREEAges 4–12 · PDF · A4/Letter

Stretching Cat

Draw a cat stretching forward with front paws extended, a raised rounded back, hind legs behind, upright ears, and a curved tail. Place the cat on a simple floor line.

Worksheet: Draw a cat sitting inside a large round basket, with its head and front paws above the rim, pointed ears, and a tail curling over one side. Add two simple basket bands.
FREEAges 4–12 · PDF · A4/Letter

Cat In A Basket

Draw a cat sitting inside a large round basket, with its head and front paws above the rim, pointed ears, and a tail curling over one side. Add two simple basket bands.

That's today's 20 free downloads!

Need more today?
Plus gives you 200 a day (fair use), no ads, Download all and a free pack every month. First month ₹99.
See Plus →

A bonus page for Plus members

See Plus

Your cart (0)

Your cart is empty.