Colouring page: Draw a satellite above a curved Earth landscape of broad farm fields, a small water canal, and a farmer near the field edge. Show the satellite observing the fields with a simple…
FREE

Satellite Over Green Fields

Draw a satellite above a curved Earth landscape of broad farm fields, a small water canal, and a farmer near the field edge. Show the satellite observing the fields with a simple….

  • Ages 2–4
  • PDF
  • A4 + US Letter
  • English

Part of Satellite Coloring Pages

More from this collection

Colouring page: Draw a large artificial satellite with two rectangular solar panels orbiting above a curved Earth, with a few clouds and stars around it. Show the satellite clearly in the foreground…
FREEAges 2–4 · PDF · A4/Letter

Satellite Above Earth

Draw a large artificial satellite with two rectangular solar panels orbiting above a curved Earth, with a few clouds and stars around it. Show the satellite clearly in the foreground….

Colouring page: Show a simple satellite floating above Earth's curved horizon, with broad mountain peaks and a small sun below it. Give the satellite two large solar panels and one clear antenna.
FREEAges 2–4 · PDF · A4/Letter

Satellite Over Mountains

Show a simple satellite floating above Earth's curved horizon, with broad mountain peaks and a small sun below it. Give the satellite two large solar panels and one clear antenna.

Colouring page: Draw a weather satellite above a large group of fluffy clouds over a curved part of Earth. Add a broad solar panel on each side and a simple dish pointed toward the clouds.
FREEAges 2–4 · PDF · A4/Letter

Weather Satellite Clouds

Draw a weather satellite above a large group of fluffy clouds over a curved part of Earth. Add a broad solar panel on each side and a simple dish pointed toward the clouds.

Colouring page: Show an artificial satellite orbiting near Earth while a crescent Moon appears farther away in the starry sky. Use clearly different shapes for the satellite, Earth, and Moon.
FREEAges 2–4 · PDF · A4/Letter

Satellite And Moon

Show an artificial satellite orbiting near Earth while a crescent Moon appears farther away in the starry sky. Use clearly different shapes for the satellite, Earth, and Moon.

Colouring page: Draw a satellite above a curved ocean horizon, with a few simple waves, a small island, and a bright sun in the background. The satellite should have wide solar panels and a short antenna.
FREEAges 2–4 · PDF · A4/Letter

Satellite Over Ocean

Draw a satellite above a curved ocean horizon, with a few simple waves, a small island, and a bright sun in the background. The satellite should have wide solar panels and a short antenna.

Colouring page: Place a satellite in orbit above Earth as the sun rises behind the curved horizon. Include broad rays, a few clouds, two solar panels, and one dish antenna.
FREEAges 2–4 · PDF · A4/Letter

Satellite At Sunrise

Place a satellite in orbit above Earth as the sun rises behind the curved horizon. Include broad rays, a few clouds, two solar panels, and one dish antenna.

Colouring page: Show a satellite above a curved Earth scene containing a few simple village houses, a tree, fields, and a person waving from the ground. Add two large solar panels and a signal arc…
FREEAges 2–4 · PDF · A4/Letter

Satellite Over Indian Village

Show a satellite above a curved Earth scene containing a few simple village houses, a tree, fields, and a person waving from the ground. Add two large solar panels and a signal arc….

Colouring page: Draw a large satellite in the sky sending two curved signal lines to a simple dish antenna on the ground. Include a small house and a low horizon beneath the satellite.
FREEAges 2–4 · PDF · A4/Letter

Satellite And Ground Dish

Draw a large satellite in the sky sending two curved signal lines to a simple dish antenna on the ground. Include a small house and a low horizon beneath the satellite.

That's today's 20 free downloads!

Need more today?
Plus gives you 200 a day (fair use), no ads, Download all and a free pack every month. First month ₹99.
See Plus →

A bonus page for Plus members

See Plus

Your cart (0)

Your cart is empty.